November 19, 2026
"For the people of San Clemente and neighboring communities, reopening this trail means restoring a connection that is an important part of everyday life along our coast," OCTA Director and Fifth District Supervisor Katrina Foley said at the October 9 ribbon-cutting at Mariposa Point, according to OCTA's release. Her point matters most on the first weekend of December. The Pier's tree lighting falls on Friday, December 4, and Santa's Village by the Sea fills Avenida Del Mar on Saturday, December 5. For the first time in two holiday seasons, the walk from North Beach to the end of the Pier is open again.
In January 2024, a landslide from private property above the railroad dropped soil and debris onto the tracks at Mariposa Point and destroyed the city's pedestrian bridge. That cut the Beach Trail in two. OCTA and Metrolink quickly built a 200-foot protective wall, and passenger trains were running again by March 2024. The trail took longer.
The finished project is much larger than that first emergency wall. A catchment wall of nearly 1,400 feet now stands between the bluff and the tracks. Crews also built a new pedestrian bridge at Mariposa Channel and rebuilt the trail with new handrail fencing and landscaping. OCTA puts the whole project at about $93 million. The trail portion accounts for roughly $24 million, mostly from state and federal sources. Construction began in September 2025.
That brings the full route back. The City of San Clemente describes the Beach Trail as 2.3 miles from North Beach to Calafia Beach, with stops at the Pier and T-Street. The City's own facility listing for Mariposa describes stair access, limited sand, street parking, no facilities and a long, steep paved path. Plan on a climb there.
The San Clemente Pier Conservancy and the City are hosting the holiday tree lighting at the end of the Pier from 4:30 to 5:30 p.m. The St. Margaret's Highlander Choir will be caroling, with free hot cocoa and candy canes. It's a short program at the far end of a long pier, so arriving on foot works well. Here is how the walk lays out from north to south:
More art is on the way. The Conservancy's third round of Art on the Pier offers commissions for an underpass mural, a bridge-entrance mural and a landing tile mural, with honorariums of $10,000, $1,000 and $7,500. The deadline for artist submissions was 5 p.m. on November 16.
On Saturday, the holiday weekend moves up the hill to downtown. The City and the Downtown Business Association's "Puttin' on the Glitz" present Santa's Village by the Sea on Avenida Del Mar and at the Community Center, 100 N. Calle Seville.
| Time | What's happening | Where |
|---|---|---|
| 2 to 10 p.m. | 100 and 200 blocks of Avenida Del Mar closed to cars | Downtown |
| 3 to 10 p.m. | Free shuttle | From San Clemente High School |
| 4 to 9 p.m. | Puttin' on the Glitz: extended shopping, live music, carolers, vendor booths, silent disco | Avenida Del Mar |
| 4:30 p.m. | Santa arrives and travels down Del Mar | Avenida Del Mar to Community Center |
| 4:45 p.m. | Tree lighting with the Mayor, City Council and the South County Handbell Choir | Grass at Avenida Del Mar and Calle Seville |
| Until 8 p.m. | Photos with Santa, snow hill, cookie decorating, crafts | Ole Hanson Fireside Room and Community Center |
Community Center activities require a wristband. Presale wristbands cost $9 for residents and $12 for nonresidents. On the day, they cost $12 and $15. The snow hill is sponsored by the Friends of San Clemente Beaches, Parks, and Recreation Foundation. The 7th Annual Gingerbread House Contest entries go on display in the Community Center. Entries are due before 2 p.m. on Friday, December 4, and pre-registration is required. Awards are presented at the tree lighting, and winning houses move to the San Clemente Art Gallery through December 10. In the Community Center lobby, the San Clemente Junior Woman's Club's Angel Tree holds gift tags for local youth and seniors.
The street closure is enforced. The City says the Orange County Sheriff's Department will tow vehicles left on the closed blocks. The San Clemente Trolley normally runs daily only from Memorial Day weekend through the last Sunday in September, but it will run from 10 a.m. to 10 p.m. on December 5. Free bike parking will be set up at South Ola Vista and Avenida Granada, in the alley off El Camino Real and Avenida Del Mar, and at Calle Seville and Avenida Del Mar. Rideshare drop-offs use the shuttle zone at the top of Avenida Del Mar and El Camino Real. If you want a sit-down dinner on the street, Zov's at 155 Avenida del Mar has been open since May, the Daily Pilot reported. It's one of the openings covered in our look at downtown San Clemente's recent restaurant bets.
A December walk to a 4:30 p.m. event means a walk home in the dark, so trail hours matter. Most of the Beach Trail is open from 4 a.m. to midnight. The southern segment from the south T-Street restrooms to Calafia Beach keeps shorter hours, 6 a.m. to 10 p.m. The City's posted rules also apply:
To make it a one-way walk, both rail stations sit on Metrolink's Orange County Line. San Clemente Pier station at 615 Avenida Victoria has 144 parking spaces at $1.50 an hour from 10 a.m. to 5 p.m. daily. San Clemente station at 1850 Avenida Estacion has 142 spaces. Pacific Surfliner has posted an advisory about possible delays between San Clemente Pier and Oceanside because of signal issues and weather, so check train status before you count on a ride back.
Mariposa Point is finished, but the work along this coast is not. Shortly after Election Day, the California Coastal Commission approved a 10-year permit for up to 690,000 cubic yards of sand and a 1,200-foot seawall, the Daily Pilot reported. OCTA's project FAQ splits the sand into about 240,000 cubic yards between Mariposa Point and North Beach and about 450,000 cubic yards south of San Clemente State Beach. The first share lands on the same stretch of trail that just reopened.
The permit conditions call for at least 690,000 cubic yards of compatible sand within one year of approval, by November 5, 2027. They also require an application for a coastal trail segment through Area 4, and through Cyprus Shore if feasible, by the same date, with a feasible alignment built by November 5, 2031. OCTA says it has secured more than $300 million in state and federal funding for coastal rail stabilization. Its emergency program also includes riprap reinforcement and more shoreline protection through San Clemente. Work crews can show up along the trail with little notice, so check OCTA's coastal rail project pages before a long walk.
If you're planning the Friday lighting and Saturday's village on foot, or wondering how the trail work might affect a home near North Beach or the Pier Bowl, I'm happy to talk it through. You can find more about the area on our San Clemente neighborhood page, and Mahlia Rittenhouse is always glad to hear from neighbors. Let's Connect.
Stay up to date on the latest real estate trends.
Whether you're buying, selling, or exploring the Southern California coast, Mahlia delivers local expertise, attentive guidance, and personalized service to help you achieve your real estate goals with confidence.